north-south corridor

Location

Singapore

client

Land Transport Authority, Singapore

services

Project Management & Design Management

The 21.5km long North-South Corridor (NSC) runs along the existing road corridor between ECP and Admiralty Road West. It will have grade-separated carriageways on the viaduct and tunnel and will largely be dual 3-lanes; except for the stretch of CTE and PIE where it will be dual 4-lanes. The NSC, also feature bus priority and active mobility measures. The tunnel section of the NSC is 12.3km long. For operation of the tunnel, five facility buildings will be provided at Ang Mo Kio Town Garden West, Marymount Road, PIE (Thomson Flyover), Kampong Java Road and Nicoll Highway. The remaining 9.2km is elevated viaduct and at-grade roads.

Asia Infrastructure Solutions is providing project management and design management services, independent engineering checking of existing structural and geotechnical design, reviewing of ST submissions, pile load test report and pile design parameters

Delivering project management services for Singapore’s longest Transit Priority Corridor to ensure smoother, faster journeys for commuters.

North South Corridor

Stay updated with the latest news and announcements from #TeamAIS.

Follow Us

Copyright © 2026 Asia Infrastructure Solutions